
The new bridge is open.

It’s a tight fit as a truck backs the bridge into position from Petersen Dr.

A large crane hoisted the span off the truck and swung it into place.

The old span, September 2003.

The new bridge is open.

It’s a tight fit as a truck backs the bridge into position from Petersen Dr.

A large crane hoisted the span off the truck and swung it into place.

The old span, September 2003.